MARC 닫기
00403nam ac200169 k 4500
000003573377
20220101120000
ta
010731s1983 US 000 eng
▼a 211070
▼c 211070
▼l WM0003021726
▼a TS183
▼a TS183
▼b R35
▼a THE DESIGN AND OPERATION OF FMS/
▼d RANKY,PAUL
▼a KEMPSTON:
▼b IFS,
▼c 1983.
▼a 348p.
▼a RANKY,PAUL
▼a 단행본
| 자료유형 : | 단행본 |
|---|---|
| 분류기호 : | TS183 |
| 서명/저자사항 : | THE DESIGN AND OPERATION OF FMS/ RANKY,PAUL |
| 발행사항 : | KEMPSTON: IFS, 1983. |
| 형태사항 : | 348p. |
| 개인저자 : | RANKY,PAUL |
| 언어 | 영어 |
WMO199922207
권 호 : 348
발행년 : 1983
서 명 : THE DESIGN AND OPERATION OF FMS
발행처 : RANKY,PAUL
목차
1. INTRODUCTION TO FLEXIBLE MANUFACTURING SYSTEMS
2. MANAGEMENT DECISIONS DURING FMS PROJECT PLANNING
3. DESIGN AND IMPLEMENTATION
4. DISTRIBUTED PROCESSING IN FMS
5. INTEGRATED CAD/CAM SYSTEMS AND PART PROGRAM PREPARATION
6. DISTRIBUTED TOOL DATA BASES IN FMS
7. FMS DATA BASE FOR CLAMPING DEVICES AND FIXTURES
8. APPLICATION OF INDUSTRIAL ROBOTS, AUTOMATED WAREHOUSES AND GUIDED
9. VEHICLES IN FMS
10. CO-ORDINATE MEASURING MACHINES IN COMPUTER INTEGRATED SYSTEMS
11. INTERFACING COMPUTERS, MACHINE TOOL CONTROLLERS AND INDUSTRIAL ROBOTS
12. COMPUTER AIDED PROJECT PLANNING AND DYNAMIC PART SCHEDULING
13. ECONOMIC CONSIDERATIONS AND CALCULATIONS
14. SOCIAL AND HUMAN ASPECTS OF FMS
서평쓰기